Cleaning off the truck after the playa
Cleaning off the truck after the playa
Partway through the build, we got a chance to stress test the new upper platform at Toorcamp, a hacker camp out conference.
http://toorcamp.org/blog
Lessons learned:
In an effort to get more people on the vehicle, we decided to reinforce the top structure and allow people to stand on the upper level. This was achieved by bracing a 8 foot wide I-Beam to the truck frame and using that as a load carrying support.
In addition, the major improvements included:
Complete 2012 Build log at Flickr
Success! There are many things that needed changing for 2012 but it turned out great!
The whole build process of the vehicle was achieved in under 5 weeks from purchase to arriving on the Playa. Overall it was successful but a very stressful build.
Complete Playa Palace 2011 Build Log on Flickr